Industry Solution

Industrial 3D Printing Equipment for Service Bureaus

A full-coverage lineup by material and process — industrial FDM (incl. PEEK) for tooling and functional parts, SLA/DLP for high-precision prototypes and dental batches, SLS for support-free complex geometry — so fewer jobs need outsourcing.

Industrial 3D Printing Equipment for Service Bureaus

Industry Pain Points

Orders swing wildly between nylon functional parts one day and resin figures the next — a narrow process lineup can't keep up.
Single-piece and small-batch jobs run on tight deadlines; machine uptime and throughput directly cap how much work you can take.
Clients expect prototype and production runs on the same validated process — switching machines mid-project means re-tuning everything.
Post-processing — sanding, coloring, vapor smoothing — eats capacity but is routinely under-quoted.
Outsourcing metal or oversized jobs to a third party gives away margin and hands over your delivery schedule.

Matched Equipment

Applications

  • Rapid prototype turnaround (24–48 hours)
  • Small-batch production of nylon/engineering-plastic functional parts
  • IP figures and display props — print and finish in one stop
  • Batch, high-precision dental models and surgical guides
Resin precision-part prototype

Resin precision-part prototype

PA12 nylon functional parts, batch run

PA12 nylon functional parts, batch run

DLP high-precision dental batch

DLP high-precision dental batch

FDM figure print & paint, single stop

FDM figure print & paint, single stop

Frequently Asked Questions

Which process should a service bureau invest in first?

It depends on your current client mix: if most jobs are functional parts or tooling, start with industrial FDM; if it's precision prototypes or dental work, start with SLA or DLP. Most bureaus eventually run both an FDM and a resin line.

Can one machine handle both prototyping and small-batch production?

Yes — our industrial machines use the same validated parameter set for both, so scaling from a prototype to a production run doesn't require re-tuning the process, which is one of the most common bureau pain points.

How soon after delivery can we start taking paid orders?

Standard machines ship with installation, commissioning and operator training — typically 1–2 weeks to first paid production run. Large-format FGF or SLM systems need a slightly longer on-site commissioning window.

Do you support OEM / private-label customization?

Yes — machine cosmetics and software splash branding can be customized. Reach out via the inquiry form below for the specific scope.

Have a Service Bureaus project to spec?

Send a brief description — we'll reply within one business day with an equipment & process recommendation.